OUR HISTORY
2022
JV signed with PAK STEEL, Pakistan's leading steel manufacturer, to build state-of-the-art, fully automated manufacturing plant in Hattar Special Economic Zone with a production capacity of 450,000 metric tons
2021
Ground breaking of 450,000 metric tons Rebar Mill at Hattar Special Economic Zone (HSEZ) with collaboration of Primetals Technologies..
2019
Peshawar Sustainable Rapid Transit Corridor Project-Sup - plied 40,000 tons steel bars. Havelian to Thakot road (KKH-II) Project-supplied more then 35,000 tons steel bars.
2019
CSR having responsibility of corporate sector, upgradation of Faisal Chawk E-7, Islamabad.
2018
Installation of Pollution Treatment Plant for improvement of Environment.
2017
Installation of new state of the art steel bars production plant with capacity of 800 metrics tons per day.
2016
Orange Line Metro Train Project Lahore: Supplied more than 35,000 tons steel bars
2015
Launched new Brand “PAK G 60 METRO"
2015
Rawalpindi - Islamabad Metro Bus Project: Supplied more than 50,000 tons steel bars.
2014
Islamabad International Airport, Islamabad & Multan Interna - tional Airport: Supplied more than 25,000 tons steel bars.
2013
Metro Bus System Project - Lahore: Supplied 25,000 tons steel bars.
2012
New increased capacity induction furnace of capacity 15 tons starts operation with CC(continous casting) technology.
2011
Achieved ISO 14000 certification on first audit at PAK STEEL and ISO 9001:2008
2010
New increased capacity Induction furnace of capacity 15 Tons installation begins in Hattar Industrial Area with CC technology.
2008
Acquired 5 Tons capacity furnace unit in the Gujranwala industri - al estate.
2006
PAK STEEL achieves TOTAL Production capacity of rebar's at 350 Tons per day
2005
Upgradation /enhancement of mill #3 in Hattar Industrial Estate Initiated.
2005
PAK STEEL introduces (Steel Girder Structural Steel) for the first time in the local market
2005
PAK STEEL Mill # 1 upgradation begins. Rough stands size (16”) installed as an intermediate mill to increase production and quality.
2004
New increased capacity induction melting furnace capacity of 7 tnos of inductotherm starts production with CC (contin - uous casting) technology.
2004
PAK STEEL successfully converted to ISO 9001:2000 version on 1st attemp/audit
2001
Dia 88 mm Plain Steel Bar Shafts were produced.
2001
Dia 85 mm Plain Steel Bar Shafts were produced.
2001
Dia 42 mm plain steel Bar were produced
2000
PAK STEEL added a new product "U-channel” to its existing structural steel- product line.
1999
Introduced Angle Iron for the first time in local market.
1998
Achieved ISO-9002 certification on 1st Audit. PAK STEEL is the first ISO certified Steel Re-Rolling Mill in Pakistan.
1997
Tee-Iron production was re-started on commercial basis
1996
Loading cranes were introduced by PAK STEEL in the local market.
1996
Another first by PAK STEEL (No.11) steel bars were rolled from 150x150mm cast billets
1996
Two sizes (No. 7 and No. 11) were produced in same shift without any changes in mill design. This double size produc - tion was first ever in the Pakistan Steel Industry
1994
New Rolling (Mill # 3) with a capacity of 150 tons per day was established in Hattar Industrial Area, NWFP, for manufactur - ing of steel bars and sections.
1992
New Mill # 2 installation work started with-in existing PAK STEEL premises.
1990
Modern induction melting system of Inductotherm Corpora - tion, USA, installed
1989
Acquired 100% ownership in the melting furnace unit and modernization initiated.
1988
Grade-40 Special 40' Steel Bars were introduced first time in local market by PAK STEEL.
1988
Melting induction Furnace purchased, under partnership, in running condition.
1988
PAK STEEL Re-Rolling Mills inauguration and commercial production commencement.
1986
“PAK STEEL Re-Rolling Mills” foundation de-markation was completed and work started for a new mill isntallation at 25, I-9 Industrial Area, Islamabad(present location)
1985
1/2’’ (No.4) Cold Twist (TOR) Steel Bars were produced.
1983
Tee-iron (structural Steel) was produced for the first time in this area.
1982
Introduce 1/2’’(No.4) square Steel bars were produced for the first time in this area.
1979
“M. farid Muhammad & Sons” mill operation was inaugurat - ed and 1/2’’ (No.4) Round (Plain) Steel Bars were produced.
1978
Partnership finished and “M. Farid Muhammad & Sons” Initi - ated its work and started rehabilitation of Mill.
1950
Istallation completed and mill started operations with imported billet (raw material). Only two Mills existed in the area at that time.
1949
A New Mill installation was started in the underdeveloped and weak steel re-rolling industry of Rawalpindi, Pakistan “M. Farid Muhammad Hussain Steel Re-Rolling Mills”.